Emergency plan for construction sites
Contents |
[edit] Introduction
Construction sites can be dangerous places, and should have an emergency plan so that quick and effective action can be taken in the event of a problem to ease the severity of the situation and to limit the consequences. An emergency plan comprises agreed, recorded and rehearsed strategies, enabling those on site to respond effectively and reliably.
Emergencies that may need to be planned for include (but are not limited to):
- Serious injuries.
- Explosion.
- Flood.
- Poisoning.
- Electrocution.
- Fire.
- Chemical spill.
- Structural collapse.
- Terrorist activity.
The provision of an emergency plan is in accordance with the Management of Health and Safety at Work Regulations 1999.
Emergency planning should begin before the commencement of any works on site. The initial emergency plan may be based on a generic plan adapted to the specific project. As the project progresses it will generally be necessary to amend the plan to take account of any changes, in particular, if an emergency or near miss has occurred.
[edit] Contents
Some of the basic information that should be included on an emergency plan might include:
- Site address.
- Date on which the emergency plan was prepared.
- Emergency personnel names and contact details.
- Evacuation routes.
- Types of emergencies.
An emergency plan should take into consideration the following:
[edit] Hazard identification/assessment
Due to the complex and fast-changing environment of a construction site, it is important that the assessment of hazards is ongoing. A thorough review of potential hazards may include:
- Proximity to traffic and public ways.
- On-site materials.
- Confined spaces.
- Plant circulation.
- Materials handling and hoisting.
- Environmental issues.
- Working in, or adjacent to, operating facilities.
- Working at height.
- Working at night or in reduced light.
Once the various hazards have been identified, the following needs to be assessed:
- What can go wrong?
- What are the possible consequences?
- What is the strategy for dealing with the consequences in an emergency situation?
[edit] Emergency resources
The emergency plan should identify the emergency resources that can be called upon if necessary, and estimated response times, based upon distances from fire stations, hospitals, and so on.
The plan should also identify on-site resources such as fire extinguishers, spills containment equipment, first aid equipment, and so on. On-site first aiders and other medical staff should be identified.
[edit] Communication systems
This involves detailing the various communication systems that are in place to enable emergency services to be contacted without delay. This can be especially critical if the site is in an isolated area that is difficult to reach. Inclement weather may render communication systems ineffective, and the plan should make clear the contingency strategy if this is the case. On large sites, emergency phones can be provided.
[edit] Emergency response procedure
Any planned procedures must be considered with the expectation that an unfolding situation may change the conditions and circumstances. The basic steps for emergency response are as follows:
- Stay calm.
- Assess the situation.
- Take command of the situation.
- Provide protection.
- Aid and manage.
- Maintain contacts.
- Guide the emergency services.
[edit] Communication and review
The emergency plan should consider how it can be communicated effectively and clearly so that all site personnel are aware of it. The following steps should be taken to review the plan:
- With subcontractors so that it covers their activities.
- With suppliers so that is covers their materials/products.
- As new areas of the site are exposed to work activities.
- With the owner/client to ensure any site-specific hazards are accounted for.
- With health and safety inspectors who may visit the site.
[edit] Post-emergency
Planning and preparation should also be made for action post-emergency, as simply returning to work may not be straight-forward. Professional counselling may be required for those suffering with post-traumatic stress. In addition, debriefing is necessary to identify how the emergency plan can be improved for the future.
[edit] Related articles on Designing Buildings Wiki
- CDM.
- Emergency services.
- Incident reporting system.
- Management of Health and Safety at Work Regulations 1999.
- Near miss.
- Reporting accidents and injuries on construction sites.
- Risk assessment.
- Risk management.
- Safety audit.
- Safety briefing.
- Safety management.
- Site records and registers.
- Toolbox talk.
Featured articles and news
Wellbeing in Buildings TG 10/2025
BSRIA topic guide updates.
With brief background and WELL v2™.
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.